Energy & Solar Parts

Inverter housings, mounting rails and clamps, cable management channels and heat sink bases — powder-coated aluminium that survives thermal cycling and UV exposure.

Get a Quote See Applications
Energy and solar inverter equipment housings
PMMAOutdoor powder grade
UV stable10yr+ colour hold
2000hSalt spray validated
RailPrecision mounting
Why Pengfeng

Three Things That Decide Whether This Part Works

We do not claim to be the cheapest metal shop in Asia. We are the one that lets you stop managing your supply chain.

/01

Thermal Cycling Is Harsh

An inverter enclosure sees daily expansion and contraction. Material choice and coating flexibility matter more here than raw thickness.

/02

Galvanic Compatibility

Dissimilar metals in contact will corrode. We specify coatings and fasteners to avoid galvanic pairs rather than ignoring them.

/03

Outdoor Colour Holds

PVDF powder on aluminium keeps its colour and gloss longer than polyester in full sun — worth the small cost difference over ten years.

How We Help

From Prototyping to Production

The same five stages whether you order one sample or 500,000 pieces.

01

Prototyping

Get parts for early-stage development. We use low-cost materials and processes to make samples that behave like the final product, so your design iterations are cheap and fast.

  • Rapid material and design iterations
  • Detailed prototypes for complex geometry
  • Models that resemble final parts
02

Engineering Validation

Functional prototypes that let you identify every design risk before you commit to tooling. Where needed this takes several iterations to hit the required performance metrics.

  • Precision parts manufacturing
  • Reliable design and engineering support
  • Optimised material properties
03

Design Validation

Validate function, performance and appearance. This is where material and finishing choices get decided — the point where a part starts looking and feeling right.

  • Parts for market and field testing
  • Performance and appearance validation
  • Durable, repeatable finishes
04

Production Validation

Prepare for full-scale production with production-grade tooling and quality control. Verify the process before you order volume.

  • Low-volume production tooling
  • Verification of manufacturing processes
  • Functionality of production-ready parts
05

Volume Production

Move to end-use parts at volume. Our in-house tooling, SPC and inspection keep yield and quality high while lead times and unit costs fall.

  • Tight tolerances on precision parts
  • Secondary operations for surface finish
  • Rigorous inspection and QC
Materials & Surface Finishes

What We Run This Job On

Grades chosen for this sector's environment. Tell us if yours is not here — we source to spec.

Materials

  • •Aluminium 6061 / 6063
  • •Galvanised steel DX51D
  • •Stainless 304 / 316
  • •Copper C110 busbars
  • •PA66-GF30 insulators
  • •PPS / PEEK high-temp

Surface Finishes

  • •PVDF fluorocarbon powder
  • •Polyester powder coating
  • •Anodizing (clear & colour)
  • •E-coating
  • •Hot-dip galvanising
  • •Anodic anti-corrosion + sealant
Applications

Common Energy & Solar Parts We Manufacture

If your part is not listed, send the drawing — custom work is the majority of what we do.

  • Solar inverter housings
  • Mounting rails and mid clamps
  • Cable management channels
  • Heat sink bases and interfaces
  • Battery cabinet enclosures
  • Tracker and mounting hardware
  • Junction boxes and combiner boxes
  • Transformer and switchgear parts
  • FAQ

    Questions We Get About Energy & Solar

    Which coating lasts longest for exposed outdoor parts?

    PVDF fluorocarbon powder on aluminium, or anodizing where a thinner film suits the design. Polyester powder is fine indoors but loses gloss faster in direct sun.

    Do you supply mounting hardware with the rails?

    Yes — clips, bolts and washers can be pressed in or kitted to your BOM.

    Send Your Energy & Solar Drawing

    STEP, DWG or a photo. An engineer reviews it and returns a firm price within two working hours — with a manufacturability note attached.